搜索结果: 1-2 共查到“岩土工程 Treatment”相关记录2条 . 查询时间(0.109 秒)
The Engineering Treatment of No.6 Waste Dump Landslide in Jianshan Pit,Panzhihua Metallurgical MiningCo
Waste Dump Engineering Treatment
2009/5/21
The Engineering Treatment of No.6 Waste Dump Landslide in Jianshan Pit,Panzhihua Metallurgical MiningCo.
Treatment Method for a Pile Foundation Accidentof 22 Storey Building
pile foundation deep foundation pit accident treatment
2009/4/30
The original foundation design of a twenty2two2storey building , geological site condition of the foundation , and the
appearance of pile foundation accident are described concisely. The treatment me...